There are currently156active government contract opportunities for this Agency.
← Back to Agencies

Stop wasting time reading multi-page solicitations to see if might be a good fit. SAMClerk uses AI to summarize these requirements into a couple of sentences.

Notice ID:PR489922

Silicon Controlled Rectifier - FTT 38 349A 6500V (12" Twisted Leads)

ORNL is requesting a quote for the same or domestic equivalent of a Rectifier, Silicon Controlled, FTT 38 349A 6500V, Attached/Soldered with 12“ Twisted Leads Included 380 System Inc. FAR 52.211-6, Br...

ENERGY, DEPARTMENT OF Published: Jul 24, 2026
Notice ID:485281

Deionization System with Recirculation and Monitoring Skid 2

UT-Battelle, LLC (the Company), is the Management & Operations contractor for the Oak Ridge National Laboratory (ORNL) located in Oak Ridge, TN. The Company is seeking proposals for the Deionization S...

ENERGY, DEPARTMENT OF Published: Jul 24, 2026
Notice ID:89503226RWA000024

Y--Rifle (RFL) Substation Communications Tower

Amendment (0001) to extend the bid closing date for the Rifle (RFL) Substation Communications Tower project.

ENERGY, DEPARTMENT OF Published: Jul 24, 2026
Notice ID:SS-2026031418

National Laboratory of the Rockies AUDIO/VISUAL IMPROVEMENTS

This is a Sources Sought Notice (SSN) issued by the Alliance for Energy Innovation, LLC (Alliance). The purpose of this SSN is to conduct market research and gather information on the current capabili...

ENERGY, DEPARTMENT OF Published: Jul 24, 2026
Notice ID:89503326QWA000398

Y--COTP RIVER CROSSING TOWER PAINTING PROJECT

COTP RIVER CROSSING TOWER PAINTING PROJECT

ENERGY, DEPARTMENT OF Published: Jul 24, 2026
Notice ID:89503226BWA000074

Y--Weld Substation Stage 05

Amendment (0009) is to update drawings as part of the Weld Substation Stage 05.

ENERGY, DEPARTMENT OF Published: Jul 24, 2026
Notice ID:DH-379784

Bulk Propane Supply Services – Fermilab

Amendment No. 1 revises the proposal due date to August 14, 2026, at 4:00 PM Central Time and adds a Site Visit for Offeror(s) on August 5, 2026, at 10:00 AM Central Time. All other terms and conditio...

ENERGY, DEPARTMENT OF Published: Jul 24, 2026
Notice ID:485281

Deionization System with Recirculation and Monitoring Skid 2

UT-Battelle, LLC (the Company), is the Management & Operations contractor for the Oak Ridge National Laboratory (ORNL) located in Oak Ridge, TN. The Company is seeking proposals for the Deionization S...

ENERGY, DEPARTMENT OF Published: Jul 24, 2026
Notice ID:AA-2026-08

Beam Position Monitor (BPM) Major Assembly - Group B, C and D

This RFP has been updated 7/24/26 to incorporate the attached "QuestionAnswer AA-2026-08.pdf" document. All other terms and condition remain the same. _________________________________________________...

ENERGY, DEPARTMENT OF Published: Jul 24, 2026
Notice ID:89503326RWA000049

Y--COTP Series Capacitor Two-Phase Design Build

Amendment 4- Extend proposal due date and update acquisition milestone schedule- California Oregon Transmission Project (COTP) Two-Phase Design-Build 525kV Series Capacitor Bank Replacement Project

ENERGY, DEPARTMENT OF Published: Jul 24, 2026
Notice ID:PR489060

Coherent Waveshaper 4800B or domestic equivalent

WaveShaper 4000B Programmable Optical Processor (WS-04000B-X-S-1-AA-00) or domestic equivalent Required domestic equivalent specs: Less than 5db of insertion loss Max power spec of 27 dBm Work across...

ENERGY, DEPARTMENT OF Published: Jul 24, 2026
Notice ID:RFQ-2026030827

Thermal System Piping

Amendment No. 1 posted 7/24/26 to answer a technical question. Purchase of Thermal System Piping Attachments: RFQ No. 2026030827 Attachment No. 1 – Technical Specifications titled “Thermal System Pipi...

ENERGY, DEPARTMENT OF Published: Jul 24, 2026
Notice ID:89503326QWA000410

J--Tracy Substation Transformer Refurbishment

Tracy Substation KT2A Transformer Refurbishment

ENERGY, DEPARTMENT OF Published: Jul 24, 2026
Notice ID:RFP_384959RLP

PIP-II Lo, Clock Distribution Connectors

Please provide proposal for the attached request for proposals (RFP 384959RLP) for “PIP-II Lo, Clock Distribution Connectors" by the due date to allow proper documentation completion. Proposal package...

ENERGY, DEPARTMENT OF Published: Jul 23, 2026
Notice ID:PR483393

Disk Storage Appliance additional Hard Drives

The Enrichment Science and Engineering Division (ESED) at Oak Ridge National Laboratory (ORNL) is looking to purchase Disk Storage Appliance additional Hard Drives. See Attachment A - RFQ483393 Bill o...

ENERGY, DEPARTMENT OF Published: Jul 23, 2026
Notice ID:PP-0002

PP-002 - BIG EXPLOSIVES EXPERIMENTAL FACILITY (BEEF) MODULAR FACILITY

The Nevada National Security Sites (NNSS) is a U.S. Department of Energy, National Nuclear Security Administration (NNSA) installation, operated by Mission Support and Test Services, LLC (MSTS), compr...

ENERGY, DEPARTMENT OF Published: Jul 23, 2026
Notice ID:PR489586

Commercial ControlLogix PLC Components

ORNL is requesting a quote for the same or domestic equivalent of ControlLogix 8 Point RTD/Thermocouple In, ControlLogix 16 Pt Digital Relay Module, ControlLogix Redundant P S Adaptor, 2-PORT CLX HI-C...

ENERGY, DEPARTMENT OF Published: Jul 23, 2026
Notice ID:PR487817

PXIe-1095, 18-slot 3U PXI Express Chassis with Timing and Synchronization Option

ORNL is requesting a quote for the same or domestic equivalent of a PXIe-1095, 18-slot 3U PXI Express Chassis with Timing and Synchronization Option and added accessories (see RFQ letter).

ENERGY, DEPARTMENT OF Published: Jul 23, 2026
Notice ID:6-B141-Q-00363-00

Laser / Electro-Optical System Components

Argonne National Laboratory is seeking to source: Please see attached solicitation package - on the ANL-70 form: Please remember to complete points A-F on page 2. NO SOLICITATION WILL BE CONSIDERED WI...

ENERGY, DEPARTMENT OF Published: Jul 23, 2026
Notice ID:89503426QWA001300

55--161 KV CROSSARM KIT HARDWARE ONLY TO REPLENISH STO

161 KV CROSSARM KIT HARDWARE ONLY TO REPLENISH STOCK FROM ND STORM IN 2025

ENERGY, DEPARTMENT OF Published: Jul 23, 2026
Notice ID:JF472266

Basic Ordering Agreement for Carpentry Services at Brookhaven National Laboratory

Amendment No. 1 (dated 7/23/26) provides responses to vendor questions and includes reference photos of the sample project work site. Use the shared link provided in this notice to access the contract...

ENERGY, DEPARTMENT OF Published: Jul 23, 2026
Notice ID:MB457842

Forward Hadronic Calorimeter Absorber Structures

Please thoroughly review all attachments to this solicitation for details. Failure to respond in accordance with the RFP's instructions may deem your proposal as unacceptable. All questions shall be s...

ENERGY, DEPARTMENT OF Published: Jul 23, 2026
Notice ID:PR477659

Precision Motion Control and Positioning System

ORNL is requesting a quote for the same or domestic equivalent of a precision motion control and positioning system.

ENERGY, DEPARTMENT OF Published: Jul 22, 2026
Notice ID:Stek-26-I07222026

EIC/ESR Quad Test Stand Power Supply

Thomas Jefferson National Accelerator Facility is partnering with Brookhaven National Laboratory (BNL) on the Electron Ion Collider (EIC) project and is seeking sources for fabrication of one (1) DC P...

ENERGY, DEPARTMENT OF Published: Jul 22, 2026
Notice ID:383185-RK

Fabrication of PIP-II GMPS CAPACITORS

Fermi National Accelerator Laboratory (Fermilab or FNAL), managed and operated by Fermi Forward Discovery Group, LLC (FFDG) under a prime contract with the U.S. Department of Energy (DOE), is seeking...

ENERGY, DEPARTMENT OF Published: Jul 22, 2026

Unlock AI summaries and opportunities details for all 156 opportunities.

Automate Alerts for all Opportunities

Data sourced from SAM.gov • Constantly Updated • Last Updated