Design-Build Services – STM Security Fencing - North Boundary
NLR seeks design-build services to install new perimeter fencing along the North boundary of its South Table Mountain Campus, remove designated existing chain-link fence sections, and complete related construction per NLR and DOE requirements, with SHPO coordination for affected work. The contractor must progress through 50% and 90% design reviews to a 100% Issued-for-Construction package, complying with codes, NLR Design Standards, CAD/BIM formats, design-to-cost objectives, and Procore documentation. Construction must follow NLR safety, security, and environmental guidelines, including utility locates before excavation, erosion control, material handling, and waste/recycling tracking. The contractor must provide project management, on-site supervision, an approved Quality Assurance Plan, and participate in required meetings, field observations, testing, and commissioning. Closeout requires as-built documentation, testing records, turnover materials, and support for NLR’s Beneficial Occupancy process.