PIP-II F-37 BUILDING LWC PUMP ROOM PIPING SYSTEM INSTALLATION
Fermilab requires fabrication and installation of a Low Conductivity Water (LCW) Piping System in the F-37 Pump Room. A pre-proposal meeting and site visit will be held on October 27 at 10:00a CDT, and PPE is required. To access the secured federal Fermilab site, offerors must complete an Access Request form at least seven days in advance, and attendees must be U.S. citizens with REAL ID. Site rules include vehicle searches and bans on weapons, explosives, controlled substances, personal alcohol/marijuana, and smoking/vaping in or near buildings. This opportunity may interest contractors experienced with piping fabrication and installation in secure DOE facility environments.
Links (0)
Attachments (25)
Data sourced from SAM.gov.
View Official Posting »