Patent Legal Services
25AUG26 - Clarification: The foreign counsel/associate referenced in Attachment 1 Performance Work Statement is considered inclusive to the Firm Fixed Price requirement. 21AUG26 - Clarifications: 1. T...
Stop wasting time reading multi-page solicitations to see if might be a good fit. SAMClerk uses AI to summarize these requirements into a couple of sentences.
25AUG26 - Clarification: The foreign counsel/associate referenced in Attachment 1 Performance Work Statement is considered inclusive to the Firm Fixed Price requirement. 21AUG26 - Clarifications: 1. T...
THIS IS AN EXISTING REQUIREMENT – Services are currently in place for this requirement via a JOFOC until this requirement is awarded. The previous contract was awarded in February 2020, in the amount...
See attached SF30 Amendment 0003. The amendment provides answers to RFIs/questions received regarding the solicitation. AMENDMENT 0003: The following documents are attached and incorporated into the s...
This part requires engineering source approval by the design control activity in order to maintain the quality of the part. Existing unique design capability, engineering skills, and manufacturing/rep...
This is a combined synopsis/solicitation for commercial products and commercial services prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in...
See attached.
The Bureau of Prisons, FCI Milan Milan, MI, is soliciting quotations under Request for Quote # 15B41727Q00000003 for 1ST Quarter FY 2027 CERTIFIED items. This acquisition is set aside for small busine...
RFQ 75H70526Q00025: To provide a UNIPOC Management System for the Red Lake Hospital All proposals are due on 09/09/2026 @ 2:00pm CST IAW Attached RFQ, offerors must fill out the attached bid schedule...
amended to change PSC code. Pumps-Cable-Brackets-Mixer
Postal Metering Machine IAW attached Statement of Work, Location - Shaw AFB Contractor Questions are due NLT 28 August 2026 at 12:00 PM EST to the Contract Specialist Proposals are due NLT 8 September...
Effective 8/25/26, this solicitation is hereby amended to include the following: 1. DLA Energy hereby issues Amendment SPE60426R0403_0002. Please see Amendment 0002 by selecting attachment, “Amd 0002_...
FWS MCNARY NWR - HERBICIDE REQUIREMENT
This part requires engineering source approval by the design control activity in order to maintain the quality of the part. Existing unique design capability, engineering skills, and manufacturing/rep...
Marine Ecological Stewardship and Conservation Services The purpose of this amendment is to include Attachment 0003- Updated Combined Synopsis/Solicitation, Attachment 0004-Updated SOW, and Attachment...
Description This is a combined synopsis/solicitation set-aside for small businesses for commercial items prepared in accordance with the format in RFO Federal Acquisition Regulation (FAR) subpart 12.6...
REQUEST FOR QUOTATIONS Lock, Key, and TRAKA Key Management System Maintenance and Support Services The Treasury Common Services Center (TCSC) on behalf of the Department of the Treasury, Financial Cri...
Please provide a quotation for the items listed below. The quote should include the applicable lead time. Please also extend any available discounts to offer Brookhaven Science Associates (BSA) your b...
Requirement: Cross-dock, cold/freeze package and deliver perishable food items for export. The Contractor will be required to provide the facility, equipment, supervision, and personnel to receive, ac...
COMBINED SYNOPSIS/SOLICITATION FOR COMMERCIAL ITEMS This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart...
Questions and Answers. Q1: Shrub and Hedge Trimming Frequency - Is shrub and hedge trimming limited to the four (4) scheduled annual services, or must the contractor include additional trimming, when...
Wind River Agency Generator Replacement
This is a Sources Sought Notice issued solely for information and planning purposes. It does not constitute a Request for Proposal (RFP), Request for Quote (RFQ), or a promise to issue a solicitation...
The elevator at C.J. Brown Dam and Reservoir is original to the project and requires modernization due to obsolete components. The contractor will provide all tools, materials, equipment, and labor to...
Please provide a quotation for the items listed below. The quote should include the applicable lead time. Please also extend any available discounts to offer Brookhaven Science Associates (BSA) your b...
The contractor shall furnish all labor, materials, equipment, transportation, and supervision necessary to service, repair, reset, and replace damaged or deficient fence components at the United State...
Unlock AI summaries and opportunities details for all 1,512 opportunities.
Automate Alerts for all OpportunitiesData sourced from SAM.gov • Constantly Updated • Last Updated