59--CABLE ASSEMBLY,SPEC
Proposed procurement for NSN 5995011203361 CABLE ASSEMBLY,SPEC: Line 0001 Qty 288 UI AY Deliver To: DLA DISTRIBUTION ALBANY By: 0125 DAYS ADO The solicitation is an RFQ and will be available at the li...
Stop wasting time reading multi-page solicitations to see if might be a good fit. SAMClerk uses AI to summarize these requirements into a couple of sentences.
Proposed procurement for NSN 5995011203361 CABLE ASSEMBLY,SPEC: Line 0001 Qty 288 UI AY Deliver To: DLA DISTRIBUTION ALBANY By: 0125 DAYS ADO The solicitation is an RFQ and will be available at the li...
ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|x|||||||| DESIRED AND REQUIRED TIME OF DELIVERY (JUNE 1997)|29|0001|2|180 days or...
Proposed procurement for NSN 5840010886662 LINEAR ARRAY: Line 0001 Qty 100 UI EA Deliver To: W1A8 DLA DISTRIBUTION By: 0073 DAYS ADO The solicitation is an RFQ and will be available at the link provid...
Proposed procurement for NSN 3655007759864 COUPLING ASSEMBLY,M: Line 0001 Qty 156 UI EA Deliver To: DLA DISTRIBUTION WARNER ROBINS By: 0088 DAYS ADO Approved source is 14487 8991173. The solicitation...
Proposed procurement for NSN 6150012688023 CABLE ASSEMBLY,SPEC: Line 0001 Qty 11 UI EA Deliver To: W1A8 DLA DIST SAN JOAQUIN By: 0415 DAYS ADO Line 0002 Qty 1 UI EA Deliver To: W1A8 DLA DIST SAN JOAQU...
Proposed procurement for NSN 2840012183557 SUPPORT,COMPRESSOR: Line 0001 Qty 24 UI EA Deliver To: DLA DISTRIBUTION DEPOT OKLAHOMA By: 0400 DAYS ADO Approved sources are 52661 4065436; 77445 4065436. T...
Proposed procurement for NSN 1440014787075 SPRING CARTRIDGE SU: Line 0001 Qty 24 UI EA Deliver To: W1A8 DLA DIST SAN JOAQUIN By: 0202 DAYS ADO Approved sources are 05DN8 704AS10899; 072E5 704AS10899;...
Proposed procurement for NSN 3110001163993 BEARING,BALL,ANNULA: Line 0001 Qty 18 UI EA Deliver To: W1A8 DLA DIST SAN JOAQUIN By: 0146 DAYS ADO This is a source controlled drawing item. Approved source...
Proposed procurement for NSN 5935015778621 ADAPTER,CONNECTOR: Line 0001 Qty 658 UI EA Deliver To: W1A8 DLA DISTRIBUTION By: 0007 DAYS ADO This is a source controlled drawing item. Approved sources are...
Proposed procurement for NSN 3110012445976 BEARING,ROLLER,THRU: Line 0001 Qty 8 UI EA Deliver To: DLA DISTRIBUTION DEPOT HILL By: 0097 DAYS ADO This is a source controlled drawing item. Approved sourc...
Proposed procurement for NSN 6150016504625 CABLE ASSEMBLY,SPEC: Line 0001 Qty 63579 UI FT Deliver To: DLA DISTRIBUTION DEPOT OKLAHOMA By: 0014 DAYS ADO Approved sources are 1V630 478626-002; 89305 478...
Proposed procurement for NSN 1680015482330 FILTER ASSEMBLY,AIR: Line 0001 Qty 4 UI EA Deliver To: W1A8 DLA DISTRIBUTION By: 0085 DAYS ADO This is a source controlled drawing item. Approved sources are...
ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|x|||||||| DESIRED AND REQUIRED TIME OF DELIVERY (JUNE 1997)|29|0001|2|180 days or...
ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|x||x|||||| STOP-WORK ORDER (A...
CONTACT INFORMATION|4|N721.05|B1F|215-697-5815|CATHY.HUGHES1@NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19|||||||||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|...
Proposed procurement for NSN 1560010125772 LINER,FLAP TRACK: Line 0001 Qty 79 UI EA Deliver To: DLA DISTRIBUTION DEPOT HILL By: 0668 DAYS ADO Line 0002 Qty 1 UI EA Deliver To: DLA DISTRIBUTION DEPOT H...
Proposed procurement for NSN 1095015300920 ARMING UNIT: Line 0001 Qty 47 UI EA Deliver To: DLA DISTRIBUTION CHERRY POINT By: 0324 DAYS ADO Line 0002 Qty 1 UI EA Deliver To: DLA DISTRIBUTION CHERRY POI...
Proposed procurement for NSN 3110001165534 BEARING,ROLLER,CYLINDR: Line 0001 Qty 24 UI EA Deliver To: W1A8 DLA DISTRIBUTION By: 0666 DAYS ADO Line 0002 Qty 1 UI EA Deliver To: W1A8 DLA DISTRIBUTION By...
ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|x|||||||| DESIRED AND REQUIRED TIME OF DELIVERY (JUNE 1997)|29|0001|2|180 days or...
Proposed procurement for NSN 1560009499414 DEFLECTOR ASSEMBLY,: Line 0001 Qty 5 UI EA Deliver To: ROYAL THAI AIR FORCE By: 0215 DAYS ADO Line 0002 Qty 1 UI EA Deliver To: ROYAL THAI AIR FORCE By: 0090...
ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| PRODUCTION LOT TESTING (11-1992)|1|40| INSPECTION AND ACCEPTANCE - SHORT...
Proposed procurement for NSN 4820012099229 VALVE,CHECK: Line 0001 Qty 26 UI EA Deliver To: DLA DISTRIBUTION CHERRY POINT By: 0080 DAYS ADO Approved sources are 78286 FLLX0500760AB; 92555 FLLX0500760AB...
Proposed procurement for NSN 3040000220008 BELL CRANK: Line 0001 Qty 16 UI EA Deliver To: DLA DISTRIBUTION DEPOT OKLAHOMA By: 0427 DAYS ADO Line 0002 Qty 1 UI EA Deliver To: DLA DISTRIBUTION DEPOT OKL...
PRE-SOLICITATION NOTICE Solicitation No.: 19GE5020R0016 The American Consulate General, Frankfurt provides the following Pre-Solicitation Notice regarding the issuance of a Request for Proposal (RFP)...
Proposed procurement for NSN 5340012815373 BRACKET,MOUNTING: Line 0001 Qty 28 UI EA Deliver To: DLA DISTRIBUTION DEPOT HILL By: 0355 DAYS ADO Line 0002 Qty 1 UI EA Deliver To: DLA DISTRIBUTION DEPOT H...
Unlock AI summaries and opportunities details for all 702 opportunities.
Automate Alerts for all OpportunitiesData sourced from SAM.gov • Constantly Updated • Last Updated