Geothermal Repair, Detroit Lakes WMD, MN
Construction Magnitude: Between $25,000 and $100,000. Contract Type: Firm-Fixed Price Period of Performance: 60 Calendar Days after NTP Site visit information is in the Provisions and Clauses attachme...
Stop wasting time reading multi-page solicitations to see if might be a good fit. SAMClerk uses AI to summarize these requirements into a couple of sentences.
Construction Magnitude: Between $25,000 and $100,000. Contract Type: Firm-Fixed Price Period of Performance: 60 Calendar Days after NTP Site visit information is in the Provisions and Clauses attachme...
Grand Canyon National Park (GRCA) requires the service of backflow prevention assemblies inspection, testing and maintenance. - per attached scope of work - Utilize blank bid schedule - done as a serv...
The purpose to Amendment 2 is correct the closing date and time to June 15, 2026, at 1800 PD.
National Park Service (NPS) Fort Pulaski National Monument is issuing combined sol/synopsis for a requirement to upgrade Electrical Distribution System at Fort Pulaski Visitor Center/Pump House. Locat...
HSTR GW and FW Roof Replacement
The Department of the Interior, National Park Service, is requesting quotes (RFQ) for the demolition of a shade structure at the Cabrillo National Monument. The Contractor shall provide all mobilizati...
The Department of the Interior, National Park Service, is requesting quotes (RFQ) for the replacement an HVAC system at the John Muir National Historic Site in Contra Costa County, California. The Con...
The Bureau of Reclamation, Missouri Basin Region, intends to issue a Commercial Request for Quote (RFQ) for the following service: DK Onsite Rescue Team The contractor shall provide a trained, qualifi...
NPS/MASI-REPLACE EPDM ROOF AT GEGR
The Upper Snake Field Office (USFO), Bureau of Land Management (BLM) is acquiring services for seed application. The Contractor shall furnish all labor, equipment, tools, materials, supervision, suppl...
This is a Sources Sought Notice for the GAOA Vale District Office Renovation & Addition design-build project located in Vale, Oregon. See attachments for details.
EO 14398 REPLACE HVAC SYSTEMS AT APOLLO DISTRICT WITHIN CANA
The US Fish and Wildlife Service has a requirement for a Relace Infiltration Gallery #2 VFD Pump at Winthrop NFH in Winthrop, WA. The bases of award will be lowest price fair and reasonable NAICS code...
EO 14398 - NRSS WRD-GNSS-IR WATER LEVEL DASHBOARD - AKRO
AK ARCTIC NWR BIG RAM LAKE Soil & Hazardous Material EVALUATION
GLBA SUPPLY HDPE HARBOR BOAT 20'
EO 14398 Installation and connection of fiber optic service lines for Craters of the Moon National Monument and Preserve.
NGWSP BLOCK 2-3 PIPELINE
REPLACE LIFT STATION PUMPS AT HOZHO PT.
This is a Sources Sought Notice for the GAOA Vale District Office Renovation & Addition design-build project located in Vale, Oregon. See attachments for details.
The Department of Interior (DOI), Wildland Fire Programs at the National Interagency Fire Center (NIFC) in Boise, Idaho anticipates issuing a solicitation for the following repairs in the 410B-RSC Fac...
Replace Halon System Control Panel in Photo Vault Building E, SAFR The National Park Service (NPS) at San Francisco Maritime National Historical Park (SAFR) has a requirement to remove and replace the...
UMESC HYDRONIC BOILER REPLACEMENT - Amd 0001
The AFWFB will requires two (2) wildland fire vehicle package builds/apparatus onto existing vehicle chassis. The requested services will install/build Fire related equipment and supply products onto...
This announcement is to amend the solicitation to post the questions/answers, Addendum to the Project Specifications, and the Revised Specifications for all interested parties for the Trail Replacemen...
Unlock AI summaries and opportunities details for all 588 opportunities.
Automate Alerts for all OpportunitiesData sourced from SAM.gov • Constantly Updated • Last Updated