Inactive
Notice ID:ID06200006
See attachments Update 5/20/21: The current DAS was installed between 2009- 2011 and is considered obsolete. Update 5/27/21: The following questions were asked. Answers are being provided to all inter...
See attachments Update 5/20/21: The current DAS was installed between 2009- 2011 and is considered obsolete. Update 5/27/21: The following questions were asked. Answers are being provided to all interested parties. -Is is assumed that the Providers will provide signalsource and data lines? Answer: If you are installing a DAS, then it is assumed you are installing the small cell system needed to operate it. -Is PCS/1900 Band coverage level assumed to be -103 dBm RSRP as well? Answer: Yes -Does the USCIS National Records Center have a preferred low voltage installation company? Answer: No Update 6/4/2021 Question: Can you request floor plans and the iBwave file from the original installation? Answer: These do not exist Question: Can you request the BOM from the original installation be provided for the active and passive components? Answer: The BOM for the original installation is obsolete. Question: Can you request photos of the Head-end and Remote location be provided? Answer: A site visit will be held AFTER the solicitation is released. You may request to take photographs. A decision will be made by the onsite DHS representative. All parties interested in competing for the contract will have the same opportunity to inspect the site and take pictures. Question: Shall new racks be provided for Head-end, or will the facility provide? Answer: The facility is not providing any equipment. Question: Are we providing parts & smarts only? Answer: No. Please see the SOO. Question: Are we providing all testing, integration and commissioning services? Answer: Define these terms. Testing and maintenance are described in the SOO. Question: Is badging required and is there a cost to CTS to obtain? We do not anticipate establishing a separate contract line item for any expenses related to security. Final determinations about how this cost will be structured will be made prior to the solicitation being released.