Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:47PJ0025R0074
The Probation office in the Bruce M. Van Sickle Federal Building & U.S. Courthouse in Minot is proposing to make alterations to their offices space on the third floor to give the space a fresh new loo...
The Probation office in the Bruce M. Van Sickle Federal Building & U.S. Courthouse in Minot is proposing to make alterations to their offices space on the third floor to give the space a fresh new look and make room for an increase in staff. Their goals are to renovate the existing space and give the newly acquired space a fresh new look, while closing off the public corridor to secure the two spaces together. The Design- Build Requirements: The Contractor will be responsible for all aspects of design and construction to complete the project objectives. All required Architect and Engineering (A/E) services are to be provided in house by a licensed A/E or subcontracted out by the Contractor to a licensed A/E. The Contractor shall provide design services, including field surveys of as-built conditions, coordination with GSA and the tenant agency, and preparation of the bidding documents and construction administration necessary to perform the work as described herein. Based on design approval, the contract will then move into construction/implementation of the design as outlined in the design documents and the below construction segment of this document. Upon receiving written approval from GSA the contractor may begin construction prior to design completion.