Inactive
Notice ID:47PF0018D0013-PS0023
GSA requires this extended period for the existing IDIQ contract to cover the need for services as there is a delay in construction of the Annex building. An extension to the IDIQ contract provides GS...
GSA requires this extended period for the existing IDIQ contract to cover the need for services as there is a delay in construction of the Annex building. An extension to the IDIQ contract provides GSA with the most effective and efficient method of contract performance until the follow-on IDIQ award is in place.