Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:47PD0218R0027
THIS POST HAS BEEN INACTIVATED AND REPLACED BY SOLICITATON 47PD0120R0039 - Lewis F. Powell Jr. U.S. Courthouse Exterior Envelope Renovation (https://beta.sam.gov/opp/4076b2ead8f0478695dc864b89dd6cb1/v...
THIS POST HAS BEEN INACTIVATED AND REPLACED BY SOLICITATON 47PD0120R0039 - Lewis F. Powell Jr. U.S. Courthouse Exterior Envelope Renovation (https://beta.sam.gov/opp/4076b2ead8f0478695dc864b89dd6cb1/view). Please refer to SOLICITATON 47PD0120R0039 for all updates and for updated attachments. The Lewis F. Powell Jr. U.S. Courthouse was constructed in 1858. Two additions were added to the Courthouse in 1911 and 1932, respectively, increasing the total square footage to 176,000 RSF. The Annex building was constructed in 1936 and includes 92,000 RSF. The Lewis F. Powell Jr. U.S. Courthouse and Annex are occupied by the U.S. Court of Appeals (COA) for the Fourth Circuit, COA Clerks, Circuit Executives, Office of Staff Council, U.S. Marshal Services, and Social Security Administration (SSA) Office of Hearing Operation. The Powell Courthouse is listed on the National Register of Historic Places individually as the U.S. Post Office and Customs House and as a contributing element to the Main Street Banking Historic District in Richmond, VA. This requirement includes all necessary construction services in accordance with the attached Specifications and Drawings. The purpose of this project is to replace, repair, and/or rehabilitate components of the exterior envelope of the Powell Courthouse and Annex in order to mitigate water infiltration. The components to be addressed include all Courthouse roofing systems, terracotta and flat roofs, window restoration/replacement at both the Courthouse and Annex, relining of rain leaders at the Courthouse, and repair of interior water damaged plaster walls and ceilings. In addition, a fall protection system for the gutter system around the terracotta roof is currently in design and will be included in the project to be performed during roof replacement activities. NOTE – The solicitionation documents are attached to this ntoice. In order to access to the specifications and drawings, please submit a request within this posting.