Inactive
Notice ID:36L79723Q0005
RFQ 36L79723Q0005 Amendment 0001 The following are Questions and Answers pertaining to subject RFQ. Question 1. The new washer extractor is required to be anchored to the existing floor slab. What are...
RFQ 36L79723Q0005 Amendment 0001 The following are Questions and Answers pertaining to subject RFQ. Question 1. The new washer extractor is required to be anchored to the existing floor slab. What are the required seismic provisions for this RFQ? Answer 1. The Quoter shall include specific seismic structural calculations for equipment anchorage on the Installation Design Drawing, which shall be prepared and sealed by a professional Engineer. Refer to Site Specific Project Requirements Section, subsection 1.3 of the updated Statement of Work included in Amendment 0001. Question 2. Â Please confirm if the specified Dry-Type Chemical Flush Dispenser feature is required in addition to the specified liquid chemical injection. Answer 2. The Dry-Type Chemical Flush Dispenser feature is required in addition to the specified liquid chemical injection.