Inactive
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Notice ID:36C78625Q50363
Site Visit on 10/2/2025 at 10:00am Meeting place it the Admin Building. Please refer to the attached documents. Summary The contractor will provide necessary labor and service to: Remove a total of 12...
Site Visit on 10/2/2025 at 10:00am Meeting place it the Admin Building. Please refer to the attached documents. Summary The contractor will provide necessary labor and service to: Remove a total of 120 gallons (for the annual period) – used oil from two 30 gallon drum(s) located at the POL storage of the maintenance building. (2 times per year) And clean the cabinet catch basin as required or needed. Remove a total of 30 gallons (for the annual period) – used coolant from the 30 gallon drum(s) located at the POL storage of the maintenance building. (1 time per year) Remove a total of 100 used oil filters (estimated amount) – used filters from the 55 gallon drum(s) located at the POL storage of the maintenance building. (2 times per year) Remove a total of 1,500 gallons of oily water from the 1,000 gallon oil/water separator tank located at the southside of the maintenance building. (2 times a year) Clean the sand interceptor of the oil/water separator (2 times a year) in conjunction with the removal and the collection of the oily water.