Y1DA--Community Living Center Phase 2 (Minor) Construction - Columbia - Project 589-404
The VA anticipates a single Firm-Fixed-Price, Design-Bid-Build contract for Phase 2 construction of a Community Living Center at the Harry S. Truman VA Medical Center in Columbia, MO. The general contractor will prepare the site, including demolition and removal of existing structures, and furnish labor and materials to build a 24-bed, 20,400-square-foot, two-story addition onto the Phase 1 CLC. The solicitation is expected to be issued in December 2026, with performance lasting approximately 790 calendar days from the Notice to Proceed. The construction magnitude is between $10,000,000 and $20,000,000. The procurement is a total Service-Disabled Veteran-Owned Small Business set-aside under NAICS 236220, with a $45 million size standard.