Y1DA--FY27 NRM - EHRM Base 573-27-702-DB EHRM Generator Upgrades Design-Build - Gainesville VAMC
The VA is conducting market research for a Design-Build team to design and construct an Emergency Power Generator Upgrade supporting Electronic Health Record Modernization at the Malcom Randall VA Medical Center in Gainesville, Florida. The turnkey scope includes A/E design, site preparation, construction, demolition, temporary emergency power, testing, commissioning, training, and documentation while maintaining required hospital emergency power throughout construction. The replacement generator must be rated at least 2,000 kW with at least 10% unused rated capacity after verified demand, planned loads, and site derating, and the team must confirm the constrained site footprint. The planned procurement is a competitive firm-fixed-price two-phase design-build with a construction magnitude between $5,000,000 and $10,000,000 and an estimated duration of 730 calendar days from Notice to Proceed. The project is planned for advertising in mid-January 2026, and the socio-economic set-aside determination will depend on market research responses.