Construct EHRM Infrastructure Upgrades - Baltimore, MD
This contract requires a contractor to perform all work detailed in the 100% Narrative and Statement of Work (SOW) provided in the bid files, adhering to all specifications and VA standards. Before construction begins, the contractor must submit an Infection Control Risk Assessment (ICRA) plan for VA approval, using severity levels from the bid documents. The work must be phased to minimize disruption to veterans and staff, and any wall or ceiling penetrations must be properly fire caulked and sealed.