PN: 636-26-502, Replace CLC Flooring (GI)
The project involves replacing existing carpet and base with Luxury Vinyl Plank and new Rubber Cove Base on the 2nd and 3rd floors of Building 1. All labor, management, and materials are included, and the contractor must verify all measurements since existing blueprints are approximate. The contractor is required to inspect the area before work begins, document any pre-existing damage in an Existing Site Conditions report with photos, and submit it for approval. The contractor must also repair any excessive damage caused by removal or installation. Performance will take place in Building 1, with no budget or timeline details provided in the description.