Inactive
Veteran-Owned Small Business Set-Aside (specific to Department of Veterans Affairs)
Notice ID:36C26323Q0349
Sources Sought Notice Sources Sought Notice Page 3 of 3 Sources Sought Notice *= Required Field Sources Sought Notice Page 1 of 3 Veteran Owned Small Business Set-Aside Sources Sought The Black Hills ...
Sources Sought Notice Sources Sought Notice Page 3 of 3 Sources Sought Notice *= Required Field Sources Sought Notice Page 1 of 3 Veteran Owned Small Business Set-Aside Sources Sought The Black Hills Health Care System requires Endoscope Drying Cabinets, accessories and installation with the Salient Characteristics in the Statement of Work below. This is a sources sought looking for Veteran Owned Small Businesses to provide endoscope drying cabinets and accessories for market research purposes. No awards of a contract will be made from this announcement. If you are a vendor that can provide the required supplies described below with competitive pricing, please send your information with a description of proof of capability to: Jeffrey.Brown8@va.gov on or before February 24th, 2023. *If applicable, 852.219-76Â VA Notice of Limitations on Subcontracting Certificate of Compliance for Supplies and Products, will apply to the potential solicitation if set-aside for Veteran Owned Small-Businesses.* *If applicable, 852.212-71 Gray Market Items, will apply to the potential solicitation.* Statement of Work The Vendor shall provide all supervision, materials, equipment for furnishing and installation of two (2) Reliance 6000 Endoscope Drying and Storage cabinets (Brand name or equal) and necessary accessories. Salient Characteristics of the Endoscope Drying Cabinets (2 Required): Cabinet measurements: 96 H X 34 D X 54 W and requires a Total width/clearance of 57.0 for the 20 scope cabinet. Electrical: 120V Network: RJ45F connection Non-porous stainless steel chamber construction. Removable drip pan and gasket-less doors. Maximum visibility through glass doors and internal lighting for inventory. Digital access, scope hang-time tracking and data collection for scope reporting. Maintained internal air pressure with air exchange every 20 seconds. Channel-purging airflow to facilitate drying of internal lumens. Vertical hanging to prevent scope contamination and damage. Meets or exceeds AAMI (ST91:2015), AORN (2016) and SGNA guidelines. Three phase HEPA filtration removes 99.97% of particulates. Startup with no plumbing or additional hook-ups. Accessories: Lowering brackets for the Endoscope Drying Cabinet 40 required Olympus - Trifurcated Drying & Tubing Set with Auxiliary Water Connector at Bottom (Brand name or equal) Services: Installation