Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:36C26222Q0989
The purpose of amendment 0001 to RFQ 36C26222Q0989 is to provide answers to questions from interested parties as well as provide updated specifications. RFQ - 36C26222Q0989 response due date and time ...
The purpose of amendment 0001 to RFQ 36C26222Q0989 is to provide answers to questions from interested parties as well as provide updated specifications. RFQ - 36C26222Q0989 response due date and time has been extended to June 17, 2022 by 4:00 pm QUESTIONS AND ANSWERS Question 1: Can we install this unit for you as well if that s ok? Answer 1.: Absolutely; IF this does not incur additional cost to the government. Question 2: What floor is this going to? Answer 2: Basement. There s a 6 wide corridor/ ramp from loading dock to the intended location. No stairs. Question 3: What is the service elevator size if the supply item is going up to a 2nd floor? Answer 3: N/A Question 4: Is it going on a main floor from unloading dock with no elevator? Answer 4: N/A Question 5: What is the amperage 120- or 208-volt plugs needed in the junction box / wire chase ? Answer 5: Â 120 volts Question 6: Can the delivery date be adjusted? Answer 6: Yes Question 7: Does the old unit need to be removed? Â Answer 7: No unit exists currently, no need for removal. Correct, this is a newly constructed space. Question 8: Can you show where the gravity roller is going on the floor plan? Is it the curved one? No curved is mentioned in the attachment B. Answer 8: The conveyor is item #113 & 137 which has a 90degree bend. Please refer to CAD drawing for reference. UPDATED SPECIFICATIONS