Z2DA--612A4-27-018 | Replace B650 3rd and 2nd Flooring
The contractor will replace approximately 38,000 SF of carpet and luxury vinyl tile, resilient wall base, stainless steel corner guards, and paint throughout Building 650’s 2nd and 3rd floors, including flooring removal, accessory installation, drywall repairs up to 20% per room, and disposal of demolished materials. Work will be performed at the Sacramento VA Medical Center, 10535 Hospital Way, Mather, CA 95655, in an active hospital with infection-control, dust-control, staging, and parking restrictions. Most work must occur outside normal hours (7:30 AM–4:00 PM, Monday–Friday, excluding weekends/holidays), with at least three weeks’ notice for any approved normal-hours work and no more than five rooms assigned at a time during weekdays. The project is limited to 240 calendar days from notice to proceed, and scheduling/phasing must be coordinated with the VA COR. Contractors must furnish all labor, materials, engineering/construction documents, product submittals/samples, and comply with VA specifications and records management requirements.