Z1DB--Replace Dietetics and Cath Lab Flooring, Buildings 1 and 1D Reno, NV Project # 654-22-003 Reno, NV
This project involves replacing approximately 850 sq. ft of flooring in the Cath Lab and 1,200 sq. ft in the Dietetics kitchen at Building 1 and 1D of the VA Sierra Nevada Health Care System in Reno, NV. The work includes demolition, disposal, and installation of new flooring, along with temporary relocation of furnishings and equipment, while adhering to infection control and life safety requirements. A pre-proposal site visit is scheduled for May 20, 2026, at 1:00 PM PT, meeting at the flag poles off Kirman Street. The contract is a firm-fixed price, 100% set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), with a NAICS size standard of $45M. No budget amount is specified in the description.