Z2DA--Install Humidification Monitoring and Control for Pharmacy Cache
Install Humidification Monitoring and Control for Pharmacy Cache
Install Humidification Monitoring and Control for Pharmacy Cache
Install Humidification Monitoring and Control for Pharmacy Cache
This contract requires modifying existing HVAC systems to provide humidification monitoring and control for two pharmacy storage rooms at the Rocky Mountain Regional VA Medical Center in Aurora, CO. The work includes installing steam dispersion manifolds, ductwork, piping, and a control system integrated with the existing building automation. The period of performance is 90 days, which includes 30 days for administrative tasks. The contractor must provide all labor, materials, and equipment, and comply with extensive safety, quality, and documentation requirements, including having an OSHA-30 certified supervisor on-site at all times.