Inactive
Notice ID:36C25819Q0223
36C25819Q0223 Additional Information Statement of Work (SOW) and Diagram Clarification During the Site Visit, it was noticed the SOW and the Diagram names for rooms did not match 100% so here is the r...
36C25819Q0223 Additional Information Statement of Work (SOW) and Diagram Clarification During the Site Visit, it was noticed the SOW and the Diagram names for rooms did not match 100% so here is the relationship SOW Names Diagram Name Biorepository Office Room 311A Biorepository Office Biorepository Lab Room 311B Packaging Wall Penetration information During the Site Survey, questions regarding Wall Penetrations were asked. After reviewing the planned pathway, here are identified penetrations. Hallway to Server Room sheetrock and then above ceiling of Server Room Partway between Communications Room and Server Room, there is a cinder block wall with expanded metal at top of blocks. Because this is a juncture between two building and one s ceiling line is 6-feet higher than the other, if the number of cables exceed current conduit space, it will require a penetration through the cinder block wall at a downward 60-degree angle. The existing conduit is a 4-inch internal pipe approximately half-full of CAT 6 cable. See photo of conduit below (Photos for Penetration #2). Partway between Communications Room and prior to the cinder block wall mentioned above, there are two-each 2- inch conduits with no cables and additional conduits with limited space for additional cables. In the event additional penetrations are required, this should a sheetrock wall. Photos for Penetration #2 Outside of Conduit Inside of Conduit