Z2DA--519-20-200 VABS Replace Boiler Plant Solicitation 36C25726B0006
Notice ID:36C25726B0006
The solicitation was posted and subsequently amended six times between April and July 2026. Offerors are solely responsible for monitoring SAM.gov for all future amendments, attachments, and updates. Failure to check for and incorporate posted amendments may render a bid non-responsive. No budget amounts or performance location are specified in this description.
Department/Ind.Agency
Subtier
Office
VETERANS AFFAIRS, DEPARTMENT OF
VETERANS AFFAIRS, DEPARTMENT OF
257-NETWORK CONTRACT OFFICE 17 (36C257)
PSC
Z2DA REPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES
LOCATION:
Not Given
Links (0)
Attachments (25)
Document
Size
Access
Updated
36C25726B0006 0006.pdf
92.92 KB
Public
Jul 30, 2026
Asbestos Survey Report September 2016 Building 2.pdf
1.98 MB
Public
Jul 21, 2026
PCRA_Replace_Boilers.pdf
719.04 KB
Public
Jul 21, 2026
ICRA_Replace_Boilers.pdf
666.54 KB
Public
Jul 21, 2026
Lead Based Paint Inspection Report Building 2 Final.pdf
363.85 KB
Public
Jul 21, 2026
Asbestos and LBP Photolog Building 2 Final.pdf
304.06 KB
Public
Jul 21, 2026
36C25726B0006 0005.pdf
303.13 KB
Public
Jul 21, 2026
36C25726B0006 Site Visit Sign In Sheet.pdf
146.03 KB
Public
Jul 20, 2026
36C25726B0006 1 Conformed Through Amendment 0004 Current as of 2026.06.12.pdf
560.89 KB
Public
Jun 12, 2026
36C25726B0006 0004.pdf
86.17 KB
Public
Jun 12, 2026
36C25726B0006 0001.pdf
104.87 KB
Public
May 21, 2026
36C25726B0006 Boiler Plant Site Visit 2.pdf
235.93 KB
Public
May 21, 2026
36C25726B0006 0003.pdf
82.14 KB
Public
May 21, 2026
36C25726B0006 0002.pdf
728.99 KB
Public
May 8, 2026
Site Visit Instructions Big Spring TX.pdf
182.1 KB
Public
Apr 27, 2026
36C25726B0006 Solicitation Posting SAM.gov.pdf
903.93 KB
Public
Apr 27, 2026
Attachment 1 519-20-200 VABS AE Replace Boiler 100_Percent_Design Analysis.pdf
129.71 MB
Public
Apr 21, 2026
Attachment 3 519-20-200 VABS AE Replace Boiler 100_Percent_Drawings_Pages62_124.pdf
23.73 MB
Public
Apr 21, 2026
Attachment 2 519-20-200 VABS AE Replace Boiler 100_Percent_Drawings_Pages1_62.pdf
18.71 MB
Public
Apr 21, 2026
Attachment 4 519-20-200 VABS AE Replace Boiler 100_Percent_Specifications.pdf
12.34 MB
Public
Apr 21, 2026
Attachment 5 ICRA Replace Boilers.pdf
523.1 KB
Public
Apr 21, 2026
36C25726B0006 Solicitation.pdf
567.87 KB
Public
Apr 21, 2026
Attachment 6 PCRA Replace Boilers.pdf
486.11 KB
Public
Apr 21, 2026
Attachment 7 Instructions for Calculation of Self-Performed Work.pdf
164.25 KB
Public
Apr 21, 2026
Attachment 8 Special Standard of Responsibility.pdf
51.9 KB
Public
Apr 21, 2026
Data sourced from SAM.gov.
View Official Posting »