Project Requirements: The Contractor shall provide all labor, supervision, material, and equipment, excluding (6) 208v electric heaters, for The Building 58 Heater Install at the Temple Boiler Plant. ...
Project Requirements: The Contractor shall provide all labor, supervision, material, and equipment, excluding (6) 208v electric heaters, for The Building 58 Heater Install at the Temple Boiler Plant. The Contractor shall install but not limited to, conduit, electrical wiring, breakers, switches, thermostats, hanging materials. Etc. The Contractor shall Install VA provided 208v electric heaters for comfort. 4.The Contractor shall clean work site and discard all trash and debris daily. 5.The Contractor shall not impede with daily boiler plant operations.