36C25723B0034 | NEW | CTX Fungal Remediation Questions 1. Will the project be conducted at night, weekend, or normal business hours? Anytime the Contractor wants to perform the work, will be fine. 2. ...
36C25723B0034 | NEW | CTX Fungal Remediation Questions 1. Will the project be conducted at night, weekend, or normal business hours? Anytime the Contractor wants to perform the work, will be fine. 2. Do any of the affected building materials that need to be removed contain asbestos? No. 3. Please provide the asbestos containing material survey for the work area for reference. Working on getting a copy 4. Please provide a drawing of the area to mark up and include in the Mold Remediation Protocol. Working on getting a copy 5. Is an air monitoring needed for this project? Yes, or will the VA provide one? No. 6. If one is needed, can you add a CLIN for this cost? No. 7. Since, this is a seal bid and COVID is over, IAW the FAR regulations can the government hold a bid opening, instead of emailing our bid? No, instructions for submitting bid are in the solicitation. 8. The solicitation specification doesn t mention installing new drywall, tape, and float. Since, this is an IFB can you please add a CLIN for the build back if it needed? No longer required, Just the abatement and certification 9. Stated in the specification. The containment will be exhausted to the outdoor environment during "active" remediation procedures. The Contractor will coordinate with Central Texas Veterans Health Care System project managers to determine a secure location for outdoor exhaust. During the site walk it was noted that we can vent through the ceiling. IAW the DSHS we would like to vent outdoor instead of through the ceiling. Yes, with HEPA Filters. 10. At the meeting, it was stated that we would be responsible for replacing, taping, and floating the drywall after remediation. We will not be responsible for painting or matching texture, is that correct? Correct.