Z2DA--589A5-23-188, AJP FCA REPAIR ROADS, PARKING, AND SIDEWALKS
This project involves the repair of roads, parking areas, and sidewalks, including demolition, paving, and ADA retrofitting, at the Colmery O Neil VAMC in Topeka, Kansas. The period of performance is 270 calendar days after the notice to proceed, and the estimated cost magnitude is between $5,000,000 and $10,000,000. This procurement is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The prime contractor must perform at least 15 percent of the general construction labor, and subcontracting to non-SDVOSB/VOSB firms is limited. The solicitation package and drawings should be available for download on or after April 09, 2026.