Z2NB--657-26-110JB - Upgrade Boiler Safety Valves , STL
Amendment 0002 Solicitation 36C25526R0035, Upgrade Boiler Steam Safety Valves P/N 657-26-110JB
Amendment 0002 Solicitation 36C25526R0035, Upgrade Boiler Steam Safety Valves P/N 657-26-110JB
This contract is for construction services to replace and upgrade eight steam safety valves within the boiler system at Building 75 of the Jefferson Barracks VA. The work involves removing and installing specific valves on three separate boilers, near a PRV station, and on a deaerator, with all new equipment required to meet detailed performance and material specifications. The contractor must provide all labor, materials, and equipment, and will be responsible for system shutdown, testing, and restart. The period of performance is 180 calendar days after the notice to proceed is issued.
This is a construction contract to replace and upgrade eight steam safety valves in the boiler system of Building 75 at the Jefferson Barracks VA. The project has an estimated performance period of 180 calendar days after notice to proceed. The specified construction cost range is between $150,000 and $500,000. This procurement is set aside exclusively for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The work involves removing old valves, installing new ones to specific technical standards, and includes all necessary labor, materials, and tasks such as system shutdown, testing, and restart.