H312--Fire System Inspection & Testing
Page 1 of Page 70 of 70 Page 1 of Fire System Inspection and Testing
Page 1 of Page 70 of 70 Page 1 of Fire System Inspection and Testing
This opportunity involves fire protection system testing and inspections across multiple buildings, with a base year (FY26) and option year 3 (FY29) for required full dry system trip and air leakage tests. The bidder raises concerns that the current CLIN structure appears to require 7 total inspection events annually (4 quarterly, 2 semi-annual, 1 annual), which exceeds NFPA standards that typically call for 2-4 inspections per year depending on the system. Additionally, dry pipe trip testing is included in every contract year, but NFPA 25 requires this only once every three years, potentially causing unnecessary system disruption and inflated pricing. The bidder seeks clarification on whether inspection frequencies should be inclusive rather than additive, and whether dry pipe trip testing should follow a 3-year cycle. No budget amounts or performance location are specified in the description.
Fire System Inspection and Testing
36C25226Q0330 Page 1 of Page 70 of 70 Page 1 of Fire System Inspection and Testing