J061--541 Electrical Power Distribution Equipment Testing, Inspection, and Maintenance - VAMC Cleveland
The purpose of this amendment is to notify the public that this Request For Quote has been canceled.
The purpose of this amendment is to notify the public that this Request For Quote has been canceled.
This amendment provides Q&A for a firm-fixed-price electrical testing, inspection, maintenance, and repair requirement at the Louis Stokes Cleveland VA Medical Center, 10701 East Boulevard, Cleveland, Ohio, with a site visit at 0900 on Tuesday, October 10, 2026, meeting at the first-floor Atrium information desk. Performance is a base year from November 1, 2026, through October 31, 2027, plus four option years, starting as soon as possible if not November 1, 2026. Scope covers an 11 kV medium-voltage distribution system including 33 MV switches, approximately 37 SEL protective relays, one ALCAD 96-cell battery system, annual infrared inspections, breaker testing for 400A and above, and transformer oil testing/replacement when required, with planned power-interruption outages expected on assigned Sundays during daylight hours and VA performing switching and LOTO. The prime contractor must have electrical testing, inspection, maintenance, and repair of power distribution systems as its primary specialty and directly perform a substantial portion of the work; subcontracting is permitted subject to FAR 52.219-14’s 50% services limitation, and NICET Level III or higher in a relevant discipline with at least five years of documented experience is accepted as equivalent to NETA certification. The requirement uses NAICS 238210 and SCA WD 2015-4727; healthcare, VA, or other mission-critical facility references are preferred, and CPARS will be reviewed for negative past performance.
The VA seeks a firm-fixed-price contractor whose primary business is electrical testing, inspection, maintenance, and repair of power distribution systems at the Louis Stokes Cleveland VA Medical Center (10701 East Boulevard, Cleveland, Ohio 44106-1702), with performance intended to start November 1, 2026 or as soon as possible thereafter, a base year through October 31, 2027 plus four option years, and a site visit set for 9:00 a.m. on Tuesday, October 27, 2026 at the first-floor Atrium information desk across from the parking garage. The scope covers an 11 kV medium-voltage system including 33 MV switches, 37 SEL protective relays, one 96-cell switchgear battery system, annual infrared inspections, triennial testing/maintenance rotations, transformer cooling-liquid testing/replacement at contractor cost, and a planned 4-hour outage test in 2029, with power-interruption work anticipated on assigned Sundays during daylight while VA performs switching and LOTO. The prime contractor must directly perform a substantial portion of technical work with qualified personnel; subcontracting is permitted subject to FAR 52.219-14’s 50% services limitation, 52.219-9 does not apply, and NICET Level III or higher in an applicable electrical power discipline plus five years documented experience is accepted as equivalent to NETA certification. Invoicing is upon completion and not more than monthly, SCA WD 2015-4727 applies for Cuyahoga County, contractor personnel need a background investigation and contractor badge, and references showing healthcare or mission-critical electrical testing are preferred. The government clarified that monthly inspections and emergency service-call response are not included, report turnaround follows the deliverables table, and any additional coordination or arc-flash studies are at contractor expense.
Page 1 of Page 1 of Page 1 of Page 1 of Description
Page 1 of Page 1 of Page 1 of Page 1 of Description