Z1DA--FY27 NRM - VISN Base Install Roof Equipment Railings - 539-22-206
36C25027B0008
The contractor will provide all tools, equipment, materials, permits, labor, and supervision to install rooftop safety railings and work platforms at the Cincinnati VA. The work includes site preparation, demolition and removal of existing structures, carpentry, roofing, abatement, and other specified construction tasks. A detailed inspection of the premises, drawings, and specifications is recommended to determine project needs and conditions. All phases of work must be completed within 240 calendar days after issuance of the Notice to Proceed.