Z1DA--***FY27 Requirement*** First Floor X Ray - Room CC157 553-CSI-022
The VA intends to issue an IFB on or about December 11, 2026, for renovation of approximately 1,244 sq ft on the first floor of the John D. Dingell VA Medical Center in Detroit, Michigan, to create an X-ray room, control room, changing/bathroom space, and refurbished waiting/check-in area. The work includes demolition and architectural, mechanical, and electrical construction such as lead-lined walls, flooring, and ceilings while maintaining medical center operations. The period of performance is 180 days, with normal working hours of 7:00 a.m.–4:30 p.m. and utility shutdowns performed outside normal hours. The estimated cost magnitude is between $500,000 and $1,000,000, and the acquisition is a 100% Service-Disabled Veteran-Owned Small Business set-aside under NAICS 236220. Contractors must meet OSHA training requirements and provide submittals, safety barriers, and fully documented construction compliance.