Z2DA--Install Compressor for SPS Cabinets 552-25-501
This opportunity involves installing a compressor for SPS cabinets at a VA facility, with work in areas featuring both hard and drop ceilings. The project requires opening a chase through drywall, exhausting negative air to the building's exterior, and adhering to ICRA Activity Category D. Work is generally scheduled during normal business hours (Monday to Friday, 0700-1700), though after-hours work may be approved. The contractor is responsible for hiring a third-party verifier for final inspection, and the installation must comply with 2024 NFPA99 standards for medical gas systems. No budget amount or specific performance location beyond the VA facility is mentioned.