Inactive
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Notice ID:36C25023B0079
The contractor shall provide all labor, supervision, materials, and equipment to Replace Panic Hardware, doors, and frames in Building 1 at the VANIHCS-Ft Wayne campus per design drawings provided by ...
The contractor shall provide all labor, supervision, materials, and equipment to Replace Panic Hardware, doors, and frames in Building 1 at the VANIHCS-Ft Wayne campus per design drawings provided by Viridian, but not limited to the following: Replacement of old doors, closures, frames, and locksets per design drawings provided by Viridian. All debris (construction & hazardous) weights must be reported to VA Contracting Officer Representative (COR). VA has option to retain some or all removed doors, closures, and locksets for attic stock. Coordinate with VA COR. Remove caulk and paint from door frames as applicable. Scraping and sanding must occur within a moveable containment barrier. Plastic taped to ceiling and zipper doors are not acceptable for containment. Removal of ACM & lead as required. Paint and seal door frames. Paint will be Sherwin Williams low odor and color will be specified by VA COR when project is awarded. Doors and frames may need to be modified to fit. Doors are to be birch, plain sliced, cocoa bean in color. Doors are to be modified by a licensed technician as to retain UL fire rating. Installation of new doors, closures, and locksets per design drawings provided by Viridian are to match existing equipment in use at VANIHCS-Ft Wayne. No continuous hinges. Closures to be LCN 4040XP. Panic hardware to be Dorma F9500B, satin chrome in color. Door hardware to be lever handle, satin chrome in color, 7-pin cylinder core. Temporary ICRA partition walls are to be used along with HEPA negative air machines. See drawing GI003 for details. Plastic taped from ceiling or zip walls is not acceptable. All walls, floors, and ceiling will be repaired if damaged during demolition and construction and returned to pre-construction conditions with matching colors and finishes.