Y1PZ--Concrete Repairs B2, B43, B45, B160 & B162
Intentionally Blank
Intentionally Blank
The James H. Quillen VA Medical Center in Mountain Home, Tennessee, requires a contractor to repair and replace concrete at several buildings, including demolishing and replacing an existing basketball court with steel-reinforced concrete. The period of performance is 14 calendar days. The estimated construction cost is between $100,000 and $250,000. This procurement is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses. The contractor must be registered in the SAM database and determined responsible in accordance with FAR Part 9.