Inactive
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Notice ID:36C24925B0014
Page 2 of 2 The Lexington VA Healthcare System has a requirement for a contractor to provide construction services for Project # 596A4-26-107 Replace Cast Iron Steam Distribution in accordance with th...
Page 2 of 2 The Lexington VA Healthcare System has a requirement for a contractor to provide construction services for Project # 596A4-26-107 Replace Cast Iron Steam Distribution in accordance with the Statement of Work, Project Specifications and Drawings. The project replaces and demolishes 700 of existing steam and condensate piping systems that are presently installed and operating at or above 15 psi. The piping entrance is at the chiller plant, tunnel entrance and at Building 1A. There are portions of the existing system that will require asbestos abatement. NAICS Code 236220 is applicable to this requirement. The Small Business size standard is $45M. The estimate range of construction is between $250,000.00 and $500,000.00 This requirement will be procured by way of FAR Part 14, as Seal Bidding selection process. The evaluation factors under consideration for this requirement will be available upon the solicitation release, which is anticipated to be on or by September 25, 2025. This requirement is a 100% set-aside for Service-Disabled Veteran Owned Small Business (SDVOSB) concerns under the authority of 38 U.S.C §8127 (d). To be considered for award, Contractors must be registered, and CVE verified in SBA DSBS (https://dsbs.sba.gov/search/dsp_dsbs.cfm. In addition to the requirements as set forth in the solicitation notice (to be issued), the proposed contractor must also be determined responsible in accordance with FAR Part 9. The Contracting Officer will determine responsibility prior to award any award being made. Questions related to this requirement will only be addressed in writing by way of email to the Contract Specialist at Robert.glenn@va.gov. The Project number, Project Name and Solicitation Number must be included in the subject line of all questions related to this requirement. No questions will be considered until the actual solicitation is released, on or by September 25, 2025. END OF PRESOLICITATION NOTICE