Y1NB--Project 546-22-110 - Construct a New Boiler Building and Controls in the Old Incinerator Area Expand/Move Graphic Control

Notice ID:36C24826R0090

Please see the solicitation 36C24826R0090

Department/Ind.Agency Subtier Office
VETERANS AFFAIRS, DEPARTMENT OF VETERANS AFFAIRS, DEPARTMENT OF 248-NETWORK CONTRACT OFFICE 8 (36C248)
  PSC   Y1NB CONSTRUCTION OF HEATING AND COOLING PLANTS
LOCATION: Department of Veterans Affairs Network Contracting Office 8 (NCO 8)
Primary Contact
Jean Pierre
305-***-3284

Links (0)

Attachments (1)


Data sourced from SAM.gov. View Official Posting »

Y1NB--Project 546-22-110 - Construct a New Boiler Building and Controls in the Old Incinerator Area Expand/Move Graphic Control

Notice ID:36C24826R0090

This is an unrestricted solicitation open to all qualified businesses for the construction of a new boiler building and controls, and the expansion/relocation of a graphic control system. The performance location and budget information are not specified in this description.

Department/Ind.Agency Subtier Office
VETERANS AFFAIRS, DEPARTMENT OF VETERANS AFFAIRS, DEPARTMENT OF 248-NETWORK CONTRACT OFFICE 8 (36C248)
  PSC   Y1NB CONSTRUCTION OF HEATING AND COOLING PLANTS
LOCATION: Not Given
Primary Contact
Jean Pierre
Not Given
Alt Contact
Aldwyn Singleton
Not Given

Links (0)

Attachments (42)

Document
Size
Access
Updated
S02 - 36C24826R0090 - 03302026.pdf
963.07 KB
Public
Mar 30, 2026
ATTACHMENT 1 - Wage Determination.pdf
31.83 KB
Public
Mar 30, 2026
ATTACHMENT 2 - EMR.pdf
174.79 KB
Public
Mar 30, 2026
ATTACHMENT 3 - Specialized Experience Form.pdf
71.23 KB
Public
Mar 30, 2026
ATTACHMENT 4 - Past Performance Forms.pdf
152.33 KB
Public
Mar 30, 2026
ATTACHMENT 5 - Base Offer Price Breakdown.xlsx
22.64 KB
Public
Mar 30, 2026
ATTACHMENT 6 - VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING.pdf
176.65 KB
Public
Mar 30, 2026
ATTACHMENT 7 - Site Map.pdf
286.22 KB
Public
Mar 30, 2026
ATTACHMENT 8 - Drawings 1 of 3.pdf
41.56 MB
Public
Mar 30, 2026
ATTACHMENT 9 - Drawings 2 of 3.pdf
36.72 MB
Public
Mar 30, 2026
ATTACHMENT 10 - Drawings 3 of 3.pdf
41.45 MB
Public
Mar 30, 2026
ATTACHMENT 11 - Site Specific Health and Safety Plan For Contaminated Soil Contact.pdf
4.55 MB
Public
Mar 30, 2026
ATTACHMENT 12 - Soil Management and Dust Control Plan.pdf
3.37 MB
Public
Mar 30, 2026
ATTACHMENT 13 - First Quarterly Groundwater Monitoring Report.pdf
3.66 MB
Public
Mar 30, 2026
ATTACHMENT 14 Yarway BlowOff Valve.pdf
2.89 MB
Public
Mar 30, 2026
ATTACHMENT 15 Architectural Narrative.pdf
5.83 MB
Public
Mar 30, 2026
ATTACHMENT 16 - Physical Security Resiliency Design Manual - PSRDM.pdf
1.76 MB
Public
Mar 30, 2026
ATTACHMENT 17 Addendum 1.pdf
8.62 MB
Public
Mar 30, 2026
ATTACHMENT 18 Addendum 1 Section 238216 Air Coils.pdf
93.87 KB
Public
Mar 30, 2026
ATTACHMENT 19 Addendum 1 Section 238200 Convection Heating and Cooling Units.pdf
90.75 KB
Public
Mar 30, 2026
ATTACHMENT 20 Addendum 1 Section 238123 ComputerRoom AirConditioners.pdf
106.39 KB
Public
Mar 30, 2026
ATTACHMENT 21 Addendum 1 Section 237300 Indoor Central Station Air Handling Units.pdf
158.32 KB
Public
Mar 30, 2026
ATTACHMENT 22 Addendum 1 Section 234000 HVAC Air Cleaning Devices.pdf
148.25 KB
Public
Mar 30, 2026
ATTACHMENT 23 Addendum 1 Section 232300 Refrigerant Piping.pdf
110.85 KB
Public
Mar 30, 2026
ATTACHMENT 24 Addendum 1 Section 232113 Hydronic Piping.pdf
146.88 KB
Public
Mar 30, 2026
ATTACHMENT 25 Addendum 1 Section 232113 Hydronic Pumps.pdf
104.33 KB
Public
Mar 30, 2026
ATTACHMENT 26 Addendum 1 Section 223500 Domestic Water Heat Exchangers.pdf
110.88 KB
Public
Mar 30, 2026
ATTACHMENT 27 - Addendum 2.pdf
81.39 KB
Public
Mar 30, 2026
ATTACHMENT 28 Addendum 2 Section 232213 Steam and Condensate Heating Piping.pdf
160.98 KB
Public
Mar 30, 2026
ATTACHMENT 29 Addendum 2 Drawings.pdf
29.51 MB
Public
Mar 30, 2026
ATTACHMENT 30 VHA Master Specifications.pdf
61.16 MB
Public
Mar 30, 2026
ATTACHMENT 31 Section 099100 Painting.pdf
228.17 KB
Public
Mar 30, 2026
Attachment 32 - DERM Letter.pdf
293.71 KB
Public
Mar 30, 2026
ATTACHMENT 33 - Boiler Safety Device Interim Safety Measure Form.pdf
100.75 KB
Public
Mar 30, 2026
ATTACHMENT 34 - Miami Main Boiler Semi Annual Safety Device Testing Documentation.pdf
3.31 MB
Public
Mar 30, 2026
ATTACHMENT 35 - Common and Emergency Parts Inventory Recommendation and Tracking Sheet.pdf
139.22 KB
Public
Mar 30, 2026
ATTACHMENT 36 A - Electronic Key Project 546-23-106 Specs.pdf
13.62 MB
Public
Mar 30, 2026
ATTACHMENT 36 B - SARGENT 10X Line Sell Sheet.pdf
478.35 KB
Public
Mar 30, 2026
ATTACHMENT 36 C - SARGENT 10X Line Catalog.pdf
1.04 MB
Public
Mar 30, 2026
ATTACHMENT 36 D - Medeco CLIQ Brochure.pdf
2.05 MB
Public
Mar 30, 2026
ATTACHMENT 37 - PCRA.pdf
300.62 KB
Public
Mar 30, 2026
ATTACHMENT 38 - ICRA.pdf
295.03 KB
Public
Mar 30, 2026


Data sourced from SAM.gov. View Official Posting »