N041--Cancer center RTU-3 temporary unit replacement with new unit (Amendment# 2)
The amendment addresses contractor questions from the site visit for the Cancer Center RTU-3 replacement at the West Palm Beach VA Medical Facility. It provides drawings and an AHU performance report as attachments. Contractors must submit crane and safety lift plans, verify the VFD location, connect the chilled water and heating valve to the new unit, and perform testing, adjusting, and balancing (TAB). The contractor is only responsible for the crane lift of the new replacement unit; the existing rental unit removal is handled by the rental contractor.