Inactive
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Notice ID:36C24825Q0729
Contractor shall provide all labor, material, and equipment to inspect and test the boilers and ancillary equipment at the Lake Baldwin VA campus, Central Energy Plant (Building 502). The work shall b...
Contractor shall provide all labor, material, and equipment to inspect and test the boilers and ancillary equipment at the Lake Baldwin VA campus, Central Energy Plant (Building 502). The work shall be documented in a full report of findings and recommendations. The report must be stamped by a licensed professional engineer. The following is a general list of equipment that must be addressed. List boilers, by make, model, size, and age. Deaerator (DA) tank Maximum Allowable Working Pressure (MAWP) Condensate tank MAWP