Y1DA--FY22: STATION (PROJ: N/A) Covered walkway and platform for temp boiler
36C24822Q1216
The Contractor shall provide all tools, equipment and materials required to build a covered walkway to connect the temporary boiler plant to the Energy Center. VACO is requiring the covered walkway pr...