J083--BUILDING 143 DIETETICS FLOORING RENOVATIONS SERVICE
Request for Quote (RFQ) Building 143 Dietetics Flooring Renovation Tuscaloosa VA Medical Center
Request for Quote (RFQ) Building 143 Dietetics Flooring Renovation Tuscaloosa VA Medical Center
The Department of Veterans Affairs anticipates awarding a firm-fixed price contract for a flooring renovation in Building 143 Dietetics at the Tuscaloosa VA Medical Center, with performance locations in Georgia, South Carolina, and Alabama. This is a total SDVOSB set-aside under FAR 12 Simplified Procedures. The period of performance is 365 days from the Notice to Proceed. The project involves replacing the existing flooring with a Sherwin-Williams Poly-Crete SLB system, including an integral cove base, and requires disconnecting and reconnecting kitchen equipment. No budget amount is specified.