DOCK AND DECK PLATE REPAIR
The project involves replacing dock plates and performing associated concrete and structural work at Buildings 14 and 15 at the Salem VA Medical Center in Salem, VA. Work at Building 14 includes removing existing dock plate and asphalt, extending the dock area with a new retaining wall, curb, concrete drive, handrail extension, and dock bumpers. Building 15 work includes removing the pit leveler, infilling the pit, pouring a concrete slab, and installing a new hydraulic pit leveler and dock bumpers. The contractor must comply with VA standards, OSHA safety, and environmental regulations, with all work inspected by the VA contracting officer’s representative. The period of performance is 120 days from issuance of the Notice to Proceed.