Z2DA--FY27 NRM 558-24-160, Domestic Water, Chilled Water and Steam Piping (VA-26-00066009)
The Durham VA Health Care System requires replacement of aging domestic water, chilled water, and steam piping (Priority 1) in Buildings 1 and 23 at the Durham VA Health Care Center, 508 Fulton St, Durham, NC. The contractor must provide all supervision, materials, labor, equipment, transportation, testing, storage, and phasing coordination to minimize disruption in a 24-hour occupied healthcare facility, including infection-control and PPE requirements. The estimated construction magnitude is between $10,000,000 and $20,000,000. Completion is required within 603 calendar days from Notice to Proceed, including procurement of long-lead items. NCO 6 intends to issue an Invitation for Bid and award a single firm fixed-price contract, with solicitation information available only through SAM.gov Contract Opportunities.