J056--Refurbish D wing Elevators
This project involves the complete modernization and refurbishment of two existing hydraulic elevators (P-5 and P-6) in the D-Wing of the Fayetteville VA Medical Center in Fayetteville, NC. The work must be performed while maintaining full hospital operations and life-safety, requiring strict adherence to infection control (ICRA) protocols and detailed phasing. The total performance timeline is outlined as 445 days across 11 specific phases. The contractor must provide all labor, materials, and equipment to deliver fully code-compliant elevators, including new control systems, hydraulic packages, doors, cab interiors, and lobby finishes. Required deliverables include as-built drawings, O&M manuals, warranties, and staff training, with all work conforming to a comprehensive set of VA, ASME, NFPA, OSHA, and building codes.