SPRINKLER SYSTEM INSPECTION AND REPAIR
36C24426Q0619
This opportunity is for a five-year contract to provide obstruction inspection, testing, and maintenance of a facility’s sprinkler systems, in compliance with NFPA 25. The scope includes internal pipe assessments, valve inspections, FDC hydrostatic testing, hydrant flow testing, and replacement of 40 sprinkler gauges. The contractor must supply all labor, materials, equipment, and supervision. No budget amount or location for performance of services is specified in the description. No non-bid or submission timelines are mentioned.