Y1DA--630A4-26-401 MRI AHU Modification
This is a design-build project to install a dedicated cooling system for an MRI suite's air handling unit at the VA Medical Center in Brooklyn, NY. The performance period is 270 calendar days, and the estimated construction cost is between $1,000,000 and $2,000,000. The work includes furnishing and installing a new 30-ton air-cooled chiller, associated piping, concrete pads, and six new fan coil units, with full integration into the existing building automation system. The contractor is responsible for all design, engineering, construction, and commissioning to achieve a complete and functional system.