Y1DA--NRM-CONST 528-CSI-102 Urology Equipment Site Prep | FY27 NRM
The Buffalo VAMC requires a contractor to renovate two Cystoscopy rooms (214 and 215), Procedure Rooms 211 and 212, and supporting spaces including check-in, office, control, vestibule, dressing, toilet, corridor, stretch alcove, and an electrical room with new panels/equipment. Rooms 214 and 215 must be prepared to receive new medical equipment, with site preparation and construction work included. The anticipated construction period of performance is 720 days.