Y1DA--528A6-19-604 Renovate B76 6th floor
This opportunity involves the renovation of the 6th floor of Building 76, with performance of services at a VA facility. The project includes abatement work, such as removing floor tile and mastic in specific rooms, and requires containment conditions for asbestos-containing material (ACM) where applicable. The VA will allow elevator use for moving new materials and construction equipment to the 6th floor. The subfloor is concrete, and an infra-red heating unit is mandatory for floor tile removal. No budget amounts or non-bid timelines were specified in the description.
Links (0)
Attachments (12)
Data sourced from SAM.gov.
View Official Posting »