Y1DA--NRM-CONST 630A4-17-433 Replace Boiler Plant Main Electrical Switchgear
This opportunity involves demolition and construction work where no pre-demolition hazardous materials survey has been performed. To ensure fairness, the government will include the abatement allowance as an open line item for the awarded contractor, rather than requiring bidders to estimate costs. Bidders are not required to include an allowance for hazardous materials survey, sampling, testing, or abatement in their bids. The location for performance of services is not specified in the description. No budget amounts or submission timelines are mentioned.
Links (0)
Attachments (20)
Data sourced from SAM.gov.
View Official Posting »