Y1AZ--Renovate SPD Phase IV Project 526-25-100

Inactive
Notice ID:36C24226B0013

This is a renovation project for a VA facility, specifically the Supply Chain Management/SPD Phase IV area. The work involves significant interior construction, including new walls, flooring, casework, security cameras, and mechanical systems, with specific requirements for Stonhard brand flooring products. A full-time dedicated site superintendent is required when work is being performed, and the project manager must be on-site part-time. The contractor is responsible for providing and installing all specified items, including furnishings, signage per VA standards, and security cameras, and must assume a concrete slab thickness of 6-8 inches for bidding purposes in demolition areas.

Department/Ind.Agency Subtier Office
VETERANS AFFAIRS, DEPARTMENT OF VETERANS AFFAIRS, DEPARTMENT OF 242-NETWORK CONTRACT OFFICE 02 (36C242)
  PSC   Y1AZ CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS
LOCATION: Not Given
Primary Contact
Akkil A Kurian
Not Given

Links (0)

Attachments (26)

Document
Size
Access
Updated
Site Visit Sign In Sheet_Renovate SPD Phase IV_1.6.26.pdf
170.97 KB
Public
Jan 22, 2026
stonseal-sk6-product-data.pdf
90.48 KB
Public
Jan 22, 2026
Stonkote color chart.pdf
261.09 KB
Public
Jan 22, 2026
Stonclad GS.pdf
90.49 KB
Public
Jan 22, 2026
stonkote ht4 product data-1.pdf
880.17 KB
Public
Jan 22, 2026
7. SUPPLY CHAIN MANAGEMENT TOTAL SUPPLY SUPPORT RENOVATION - 100Specifications.pdf
4.15 MB
Public
Jan 22, 2026
6. SUPPLY CHAIN MANAGEMENT TOTAL SUPPLY SUPPORT RENOVATION - ELECTRICAL - 100DRAWINGS - Signed and Sealed.pdf
9.2 MB
Public
Jan 22, 2026
5. SUPPLY CHAIN MANAGEMENT TOTAL SUPPLY SUPPORT RENOVATION - FIRE PROTECTION - 100DRAWINGS - Signed and Sealed.pdf
1.77 MB
Public
Jan 22, 2026
4. SUPPLY CHAIN MANAGEMENT TOTAL SUPPLY SUPPORT RENOVATION - PLUMBING - 100 DRAWINGS - Signed and Sealed.pdf
5.26 MB
Public
Jan 22, 2026
3. SUPPLY CHAIN MANAGEMENT TOTAL SUPPLY SUPPORT RENOVATION - MECHANICAL - 100DRAWINGS - Signed and Sealed.pdf
8.32 MB
Public
Jan 22, 2026
2. SUPPLY CHAIN MANAGEMENT -TOTAL SUPPLY SUPPORT- RENOVATION - STRUCTURE - 100 DRAWINGS - Signed and Sealed.pdf
454.47 KB
Public
Jan 22, 2026
1. SUPPLY CHAIN MANAGEMENT TOTAL SUPPLY SUPPORT RENOVATION - ARCHITECTURE - 100 DRAWINGS - Signed and Sealed.pdf
9.3 MB
Public
Jan 22, 2026
36C24226B0013 0002.docx
84.49 KB
Public
Jan 22, 2026
S02 36C24226B0013_2.docx
309.47 KB
Public
Dec 30, 2025
36C24226B0013 0001.docx
27.57 KB
Public
Dec 30, 2025
013200 Construction Documentation.docx
19.99 KB
Public
Dec 29, 2025
SUPPLY CHAIN MANAGEMENT- TOTAL SUPPLY SUPPORT RENOVATION - FIRE PROTECTION - 100 DRAWINGS.pdf
1.23 MB
Public
Dec 29, 2025
SUPPLY CHAIN MANAGEMENT -TOTAL SUPPLY SUPPORT RENOVATION - STRUCTURE - 100DRAWINGS.pdf
891.16 KB
Public
Dec 29, 2025
SUPPLY CHAIN MANAGEMENT-TOTAL SUPPLY SUPPORT RENOVATION - PLUMBING - 100 DRAWINGS.pdf
3.51 MB
Public
Dec 29, 2025
SUPPLY CHAIN MANAGEMENT -TOTAL SUPPLY SUPPORT RENOVATION - ARCHITECTURE - 100DRAWINGS - REV 12-17.pdf
8.11 MB
Public
Dec 29, 2025
SUPPLY CHAIN MANAGEMENT -TOTAL SUPPLY SUPPORT RENOVATION - MECHANICAL - 100DRAWINGS.pdf
5.67 MB
Public
Dec 29, 2025
SUPPLY CHAIN MANAGEMENT- TOTAL SUPPLY SUPPORT - RENOVATION - ELECTRICAL - 100DRAWINGS - REV 12-17.pdf
6.29 MB
Public
Dec 29, 2025
SUPPLY CHAIN MANAGEMENT TOTAL SUPPLY SUPPORT RENOVATION - 100 Specifications 02.pdf
2.68 MB
Public
Dec 29, 2025
S02 WAGE DETERMINATION BRONX COUNTY.pdf
57.56 KB
Public
Dec 29, 2025
S02 Buy American Certificate blank.pdf
417.44 KB
Public
Dec 29, 2025
S02 852.219-75 Limitation on Subcontracting Jan 2023- Blank.docx
16.54 KB
Public
Dec 29, 2025


Data sourced from SAM.gov. View Official Posting »

Y1AZ--Renovate SPD Phase IV Project 526-25-100

Inactive Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Notice ID:36C24226B0013

This is a construction contract to renovate the Sterile Processing Department at the James J. Peters VA Medical Center in Bronx, New York, with the goal of improving workflow and infection control. The work includes significant architectural, mechanical, HVAC, and electrical upgrades, as well as the installation of a new Avigilon video surveillance system. The period of performance is 700 calendar days from the notice to proceed. The magnitude of construction cost is estimated to be between $1 million and $5 million. This procurement is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses.

Department/Ind.Agency Subtier Office
VETERANS AFFAIRS, DEPARTMENT OF VETERANS AFFAIRS, DEPARTMENT OF 242-NETWORK CONTRACT OFFICE 02 (36C242)
  PSC   CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS
LOCATION:

Links ()

Attachments ()


Data sourced from SAM.gov. View Official Posting »