Y1AZ--Renovate SPD Phase IV Project 526-25-100
This is a renovation project for a VA facility, specifically the Supply Chain Management/SPD Phase IV area. The work involves significant interior construction, including new walls, flooring, casework, security cameras, and mechanical systems, with specific requirements for Stonhard brand flooring products. A full-time dedicated site superintendent is required when work is being performed, and the project manager must be on-site part-time. The contractor is responsible for providing and installing all specified items, including furnishings, signage per VA standards, and security cameras, and must assume a concrete slab thickness of 6-8 inches for bidding purposes in demolition areas.
Links (0)
Attachments (26)
Data sourced from SAM.gov.
View Official Posting »