Z1DA-- 630A4-26-500 Replace ER AHU Brooklyn Campus
This project requires the complete replacement and refurbishment of the HVAC system serving the Emergency Room at the Brooklyn campus, including a new air handling unit, exhaust fans, reheat system, heat exchanger, pumps, and constant volume boxes. The performance period for the work is 240 calendar days. The contractor must install a temporary 100-ton HVAC unit to maintain ER operations during the replacement, coordinate all work to minimize impact, and comply with extensive VA specifications and safety requirements. The contractor is required to use the VISN 2 Autodesk Build platform for project management and complete specific VA privacy training.